Smart Factory Tour at TRUMPF
Wednesday, February 18, 2026 (1:00 PM - 3:00 PM) (EST)
Description
Join us for our latest ManufactureCT Plant Tour
The 55,800 sq.ft.Trumpf Smart Factory in Farmington
🗓️ February 18, 2026 | 🕧 1:00–3:00 PM | 📍Trumpf Inc, 3 Leibinger Way, Farmington
TRUMPF is a global leader in the fabrication of machine tools and laser technology used in manufacturing. A subsidiary of the privately held TRUMPF Group, TRUMPF Inc. opened in Farmington, Connecticut in 1969 and oversees additional offices in California, Illinois, New Jersey, and Michigan.)
TRUMPF's smart factory in Connecticut expands local production of the high-tech fabricating equipment used by North American manufacturers to produce sheet metal parts. Designed by Barkow Leibinger, the bright, modern facility features advanced automated and connected manufacturing technology, including laser cutting, punching, bending, and welding equipment, to produce new TRUMPF machinery. The Smart Factory is also open to thousands of manufacturers who visit the Connecticut campus each year to see real-life applications of the innovative system and learn how to customize the technology for their own production needs.
Refreshments will be served after the tour.
This tour is open to both members and non-members of ManufactureCT. Registration is required in advance.
Images
Manufacturing Members $25
Supporting Members $50
Affiliate Members $25
Manufacturing Non-Member $50
Supporting Non-Member $75
3 Leibinger Way
Farmington, CT 06032 United States

TRUMPF, Inc. 3 Leibinger Way Farmington CT 06032
Refreshments will be served after the tour.